A Laboratory Is Only as Reliable as Its Layout.

Laboratories are often planned last and squeezed into the space that remains, which is where sample routes cross, microbiology shares air with production and incubators end up in corridors. ALVEDA plans QC and microbiology laboratories from their workflows: how samples arrive, where analytical and microbiological work is separated, what environment a sterility test needs, and how media, chemicals, glassware and waste move. Equipment, environmental conditions and utility requirements are defined room by room so that architecture, HVAC and MEP can design to a clear brief.

Engineering phases

Where this service fits

04 / 09 phases in scope

  1. 01Feasibilitynot in scope
  2. 02ConceptIn scope
  3. 03Basic EngineeringIn scope
  4. 04Detailed EngineeringIn scope
  5. 05Procurementnot in scope
  6. 06Constructionnot in scope
  7. 07CommissioningIn scope
  8. 08Validationnot in scope
  9. 09Operationnot in scope

Scope

What the service covers

  1. 01Laboratory zoning and room program
  2. 02Analytical and microbiology workflow separation
  3. 03Sterility-testing environment planning
  4. 04Sample, personnel and laboratory waste flow
  5. 05Media, chemical and consumable storage
  6. 06Equipment, environmental and utility requirements

Method

From inputs to deliverables

INInputs

06 items
  1. I01Testing scope: raw material, in-process, finished product and environmental samples
  2. I02Expected sample volumes and turnaround
  3. I03Analytical and microbiological methods in use or planned
  4. I04Hazardous samples or reagents, as identified by the client
  5. I05Existing equipment to be relocated
  6. I06Quality requirements defined by the client

WORKActivities

06 items
  1. W01Workflow mapping per test type
  2. W02Room program and adjacency planning
  3. W03Definition of classified areas for sterility testing
  4. W04Equipment planning and bench layout
  5. W05Environmental and utility requirements per room
  6. W06Coordination with HVAC, MEP and architecture

OUTDeliverables

05 items
  1. D-26.01Laboratory room program and zoning layout
  2. D-26.02Sample, personnel and waste flow diagrams
  3. D-26.03Laboratory room data sheets
  4. D-26.04Equipment list and layout
  5. D-26.05Utility and environmental requirements schedule

Technical detail

Laboratory planning topics

  • Analytical chemistry and microbiology have different risks and should not share the same route or air without a reason.

    • Analytical laboratory zoning
    • Microbiology laboratory zoning
    • Separation from production areas
    • Office and documentation areas outside the laboratory workflow

Deliverables

Typical documents and outputs

  1. D-26.01Laboratory room program and zoning layout
  2. D-26.02Sample, personnel and waste flow diagrams
  3. D-26.03Laboratory room data sheets
  4. D-26.04Equipment list and layout
  5. D-26.05Utility and environmental requirements schedule

Services

Related services

  • 22

    Environmental Monitoring Strategy

    Viable, surface, pressure, temperature and humidity monitoring planned with instruments and data logging.

  • 06

    Process Utilities

    Steam, air, gases, water and drainage systems sized and specified for regulated production.

  • 24

    Facility Zoning & Flow Studies

    Classification zones and personnel, material and waste routes resolved before the layout is fixed.

Next step

Planning a pharmaceutical project?

Share the product type, the current stage and the main constraints. We will respond with a proposed scope and next steps.