Skip to content

Service 05 / 18 · HVAC Engineering

Airflow Is Part of the Process.

HVAC is the system that holds a cleanroom in its classified state. Zoning, air change rates, HEPA filtration and AHU configuration are derived from room data sheets and the pressure cascade. Controls and monitoring are defined early, so BMS and EMS scope is clear before procurement.

Engineering phases

Where this service fits

07 / 09 phases in scope

  1. 01Feasibilitynot in scope
  2. 02ConceptIn scope
  3. 03Basic EngineeringIn scope
  4. 04Detailed EngineeringIn scope
  5. 05ProcurementIn scope
  6. 06ConstructionIn scope
  7. 07CommissioningIn scope
  8. 08ValidationIn scope
  9. 09Operationnot in scope

Scope

What the service covers

  1. 01Design criteria and HVAC zoning
  2. 02AHU configuration and HEPA filtration strategy
  3. 03Pressure cascade and air change rates
  4. 04Temperature and humidity control
  5. 05Heating and cooling load calculations
  6. 06Control philosophy and BMS interface

Method

From inputs to deliverables

INInputs

05 items
  1. I01Room data sheets and cleanliness grades
  2. I02Cleanroom zoning and pressure strategy
  3. I03Process heat and moisture loads
  4. I04Site climate data
  5. I05Occupancy and operating hours

WORKActivities

06 items
  1. W01Design criteria definition
  2. W02Load and airflow calculations
  3. W03AHU zoning and configuration
  4. W04Pressure cascade balancing
  5. W05Duct routing and terminal selection
  6. W06Control and monitoring definition

OUTDeliverables

09 items
  1. D-05.01Design basis
  2. D-05.02Load calculations
  3. D-05.03Airflow calculations
  4. D-05.04Pressure diagram
  5. D-05.05AHU schedule
  6. D-05.06Duct layouts
  7. D-05.07Control philosophy
  8. D-05.08Equipment datasheets
  9. D-05.09BOQ

Technical detail

HVAC design topics

    • Cleanliness grade per room
    • Outdoor design conditions
    • Product and process sensitivities
    • Personnel comfort requirements

Cleanrooms & HVAC

Airflow Is Part of the Process.

Explore how a cleanroom suite is organised: cleanliness grades, pressure relationships and the separate routes for people and materials.

01 / 04 — Z-GRAD

Grade / Zone

Each room is assigned a cleanliness grade from the process risk it carries.

  • Grade B — process room
  • Grade C — airlocks and wash room
  • Grade D — gowning
  • CNC — controlled, not classified corridor

Showing layer: Grade / Zone

CR-01 · CLEANROOM SUITE · N.T.S.LAYER Z-GRADILLUSTRATIVE — NOT A PROJECT DRAWING1234M1M2M3PB-01PALGRADE C++GOWNGRADE D+PROCESSGRADE B+++WASHGRADE C++MALGRADE C++CORRIDORCNC0 REF

Swipe to see the whole plan

IllustrativeIllustrative layout for explanation only — grades and pressures are set for each project.

Deliverables

Typical documents and outputs

  1. D-05.01Design basis
  2. D-05.02Load calculations
  3. D-05.03Airflow calculations
  4. D-05.04Pressure diagram
  5. D-05.05AHU schedule
  6. D-05.06Duct layouts
  7. D-05.07Control philosophy
  8. D-05.08Equipment datasheets
  9. D-05.09BOQ

Services

Related services

  • 04

    Cleanroom Design

    Classified spaces with defined pressure cascades, airlocks and gowning sequences.

  • 18

    Facility Upgrades & Retrofit

    Expansions, upgrades and retrofits engineered around the facility that is already running.

  • 08

    Qualification & Validation (CQV)

    Documented evidence that facilities, utilities and equipment perform as intended.

FAQ

Questions about this service

  • Yes. Upgrades usually start with a review of the current zoning, pressure cascade and air handling against the process, followed by a phased design that keeps requalification in view.

Next step

Planning a pharmaceutical project?

Share the product type, the current stage and the main constraints. We will respond with a proposed scope and next steps.

+20 101 171 1700