Skip to content

Validation

Understanding URS, DQ, FAT, SAT, IQ, OQ and PQ

Planned
StatusPlanned

This article is in preparation.

The topic is planned and the article has not been written yet. Nothing on this page is published technical guidance.

What it will cover

This article will examine the qualification sequence from the user requirements specification (URS) through design qualification, factory and site acceptance tests, and installation, operational, and performance qualification. It will also show how traceability between requirements and test evidence keeps each step from repeating the last.

Working on this topic now?

If this question is live on your project, you do not need to wait for the article. Tell us about the facility and we can discuss it directly.

Related articles and topics

All insights
  • 02Pharma Engineering

    Pharmaceutical Water Systems: RO, PW and WFI Explained

    How a pharmaceutical water system is built up from pretreatment through reverse osmosis and polishing to Purified Water, where Water for Injection fits, and why the WFI technology, the loop temperature and the sanitization method are project decisions rather than fixed answers.

Next step

Planning a pharmaceutical project?

Share the product type, the current stage and the main constraints. We will respond with a proposed scope and next steps.

+20 101 171 1700